Zamzam well to be redesigned into something new, as confirmed by the Saudi Arabian Authorities. This will be a new structure of managing the sacred water.
MAKKAH: The General President of the Affairs of the Two Holy Mosques Sheik Abdulrahman Al-Sudais declared the begin of the Zamzam well-preparing venture.
Al-Sudais commended the state’s enthusiasm for Zamzam water since its foundation by King Abdul Aziz. He committed the Zamzam well to profit Muslims, and his children have taken after his means and are applying more endeavors to work well for this favor.
He indicated the significance of this task as far as Zamzam water, Prophet Muhammad (peace arrive) stated: “The water of Zamzam is (great) for whatever it is planned.”
The task comprises of two segments. The main segment incorporates the development of the five-benefit scaffolds to Zamzam from the eastern side, with an aggregate width of eight meters and a length of 120 meters.
It additionally incorporates the improvement of a unique nature of sterile rock with a high penetrability of water, permitting the better stream of Zamzam water.
The second segment is to finish the last period of sanitization and treatment of the earth encompassing Zamzam well, that incorporates stays of concrete and iron vaults of the old Grand Mosque, to lessen the extent of hurtful substances in Zamzam water however much as could be expected.
The planned day and age for the venture is seven months, and the work is required to be finished before Ramadan.
Subscribe to our channels on WhatsApp, Google News, Facebook and Instagram.